Det Norske_Ivar Aasen_Onshore Operation Centre_3DReference case.

The Ivar Aasen field was developed as a stand-alone platform for partial processing and water conditioning and injection, with transfer of the multiphase hydrocarbon mixture to the neighbouring Edvard Grieg.

Short story:

    • An onshore operation centre was developed
    • Eldor responsibility included engineering and coordinating of the onshore and offshore control centre
    •  During detail-engineering Eldor ensured that the Control Suite design was based on Human Factors and Working Environment requirements with end user involvement 

Fill out the form and get your copy now ->>